<address id="nxvj9"></address>
      <address id="nxvj9"></address>
        <thead id="nxvj9"></thead>
        <sub id="nxvj9"></sub>

        <address id="nxvj9"></address>
        <form id="nxvj9"></form>
        <address id="nxvj9"></address>

           
          螺杆空压机
          搜索:
        1. Company Culture
        2.  
          Home>>News
          Screw air compressor maintenance
          Date:2012-04-26 16:16:55
          Maintenance projects, in addition to the three maintenance projects, it takes another:
          1, check the screw joint contact and insulation resistance of the electrical part of the air compressor;

          2, replace the motor grease replaced every 8000 hours (per run), such as equipment specification parameters by manual prevail;

          3, the cleaning load reduction valve (intake valve);

          Cleaning the minimum pressure valve (to maintain the pressure valve);

          5, the cleaning of the check valve of the oil return;

          6, cleaning thermostatic valve;

          7, cleaning the cooler;

          8, cleaning of the water-gas separator;

          9, correcting all the parameters.

          Note: The above maintenance should only equipment to confirm no electricity, no pressure.

           
             Copyright 2011-2012 © carrier compression machinery(shanghai) co.,ltd.
          Shanghai TEL:021-39547210,021-39547095 FAX:021-39546705 Address:Sahnghai City Jiasong N. 4777
          Shandong TEL:0531-68818620,0531-68818621 Straight-line:13665413535 (Mr. Wang)
          济南熟女的叫声让人热血沸腾